3D-printed buildings around the world: Wolf Ranch, the largest printed neighbourhood, reaches 100 homes

ICON, Lennar and Bjarke Ingels Group have built in Texas the largest residential development constructed with 3D printing, with homes of 140 to 195 m² printed in around three weeks

The Data
Wolf Ranch: 100 printed homes, 8 floor plans of 140 to 195 m², from $430,000 and around 3 weeks of printing per house.

Additive manufacturing in building now has a neighbourhood-scale benchmark. At Wolf Ranch, in Georgetown (Texas), homebuilder Lennar, technology company ICON and the studio BIG have printed 100 single-family homes. Construnews opens its map of 3D-printed buildings around the world with this project.

3D printing of buildings has moved in a few years from prototype to residential development. The most visible milestone is in the United States: Wolf Ranch, in Georgetown (Texas), on the outskirts of Austin, is the world’s largest neighbourhood of 3D-printed homes, with 100 single-family houses.

Three partners for a printed neighbourhood

The project was announced in 2021 and brings together three players. Homebuilder Lennar is the developer. Austin-based technology company ICON, which has been printing homes since 2018, provides the printing technology. The design is by Bjarke Ingels Group (BIG).

The houses form the Genesis Collection and come in eight different three- and four-bedroom floor plans, ranging from 1,500 to 2,100 square feet (roughly 140 to 195 m²). Prices started at $430,000 and went up to around $600,000.

Wolf Ranch brings together 100 3D-printed homes in eight floor plans of between 140 and 195 m²

How a home is printed

The walls are printed on site by Vulcan, ICON’s robotic printer, layer by layer, using a proprietary material called Lavacrete. According to the company, it lasts longer than standard concrete masonry, and the walls are designed to resist water, mould and termites.

Printing each home takes around three weeks. Not everything is printed: the foundations and the metal roofs with solar panels are built with conventional systems. The result combines the formal freedom of printing with serial construction at the scale of a housing development.

Printing the walls of each home takes around three weeks; foundations and roofs are conventional

From pilot house to development

In summer 2024, the Vulcan printer was finishing the last homes in the development. Wolf Ranch shows that 3D printing can work at neighbourhood scale and with a conventional homebuilder.

Prices for Wolf Ranch’s 3D-printed homes start at $430,000

The project also illustrates the technology’s remaining challenges: foundations and roofs still rely on traditional construction, and by August 2024 a little more than a quarter of the 100 homes had been sold, according to Reuters. Even so, Wolf Ranch has become the global benchmark for measuring the potential of 3D printing in housing.

Newsletter

Recent posts

The map of cross-laminated timber in Spain: 73,800 m³ of capacity and close to 500 projects

Spain has an approximate production capacity of 73,800 m³ of cross-laminated timber (CLT), around...

The world’s tallest timber buildings: Ascent holds the record at 86.6 metres

The vertical race in timber has a certified leader: the Ascent tower in Milwaukee,...

The software platforms that dominate the AECO sector: Autodesk’s AECO segment brings in $3,583 million

Software for architecture, engineering, construction and operations (AECO) is enjoying a period of sustained...

The cement plants leading carbon capture: Brevik already captures 400,000 tonnes of COâ‚‚ a year

Carbon capture and storage (CCS) has moved from pilot projects to industrial scale in...

Mataró’s La Casa del Pirata named interiors project of the year at Dezeen Awards 2026, which also reward EMBT and Pablo Castillo

The Dezeen Awards 2026, the annual awards programme of the British architecture and design...

Spanish Government approves the royal decree-law that opens the door to the €9 billion Social Climate Plan

Spain's Council of Ministers agreed on 20 November to send to the Standing Committee...

Digital infrastructure sets the pace for global construction in 2027 as Europe grows at half speed

Consultancy Deloitte has published its 2027 Engineering and Construction Industry Outlook, focused on the...

London office rises with 78% of its structure made from steel reclaimed from another building

Developer GPE has completed 30 Duke Street St James's in London's West End, an...

Related posts

The map of cross-laminated timber in Spain: 73,800 m³ of capacity and close to 500 projects

Spain has an approximate production capacity of 73,800 m³ of cross-laminated timber (CLT), around...

The world’s tallest timber buildings: Ascent holds the record at 86.6 metres

The vertical race in timber has a certified leader: the Ascent tower in Milwaukee,...

The software platforms that dominate the AECO sector: Autodesk’s AECO segment brings in $3,583 million

Software for architecture, engineering, construction and operations (AECO) is enjoying a period of sustained...

The cement plants leading carbon capture: Brevik already captures 400,000 tonnes of COâ‚‚ a year

Carbon capture and storage (CCS) has moved from pilot projects to industrial scale in...

Digital infrastructure sets the pace for global construction in 2027 as Europe grows at half speed

Consultancy Deloitte has published its 2027 Engineering and Construction Industry Outlook, focused on the...

London office rises with 78% of its structure made from steel reclaimed from another building

Developer GPE has completed 30 Duke Street St James's in London's West End, an...

CNC warns that infrastructure investment cannot be delivered without better public procurement

Infrastructure maintenance cannot depend on tragedies. That was the message delivered by the Confederación...

Euroconsult calls for €20.4bn to diagnose the real condition of Spain’s infrastructure before investing

Spain should spend around €20.4 billion on engineering over the next decade to establish...

Spain’s civil engineers call for €413bn over ten years for infrastructure and send 85 measures to the parties

Eleven days before Spain's general election on 29 November, the Colegio de Ingenieros de...