A collaborative map now brings together more than 800 timber buildings

The tool created by architect Irene Jimeno at Toca Madera · Sounds Wood classifies each project under more than 15 parameters, has passed 235,000 visits and will be expanded again in December

The Data
Toca Madera's collaborative map brings together over 800 timber buildings, classified under 15+ parameters, with over 235,000 visits.

Where is timber being used in construction, and who is doing it? The Collaborative Interactive Map of Timber Construction was born in 2020 to answer that question. Today it is a free, open database of more than 800 projects used by researchers, technical professionals, companies and students.

The Collaborative Interactive Map of Timber Construction (Mapa Colaborativo Interactivo de Construcción con Madera) is an initiative of Toca Madera · Sounds Wood, the outreach, training and technical consultancy platform run by Irene Jimeno Guadalix, an architect specialising in timber construction with a master’s degree in Structural Timber Engineering. Built on Google My Maps and free to access, it now includes, according to its website, more than 800 timber projects, classified under more than 15 parameters, and has received over 235,000 visits.

An unanswered question in Innsbruck

The map’s origins go back to late 2019, at the Forum Holzbau International in Innsbruck (Austria). A European researcher asked whether tall buildings were being built with CLT (cross-laminated timber) in Spain, and Jimeno found there was hardly any data to answer the question. During the 2020 lockdown, Toca Madera began posting quiz questions about timber buildings on Instagram and, once the state of emergency ended, decided to build a tool that would “grow with everyone’s knowledge”.

The map was launched in July 2020. It was initially meant to cover only buildings in Spain, but it soon added projects from other European countries and beyond. In September 2020 it listed 52 locations and had about 5,000 visitors; by May 2021 it already included almost 300 buildings and 24,000 visits.

It is not my platform, nor Toca Madera’s as such. We have only planted the seed so that we can all collaborate

Fifteen fields to describe each building

Each project is documented in a 15-field record: name of the building; architects or engineers; technical advice; use or activity; timber product; timber company; construction system; construction or assembly company; connections and fixings company; modelling (3D design); structural calculation; type of wood; treatment; treatment company; and certification (PEFC, FSC or similar).

This structure allows buildings to be filtered by use (educational, cultural, sports, public service, single-family or residential housing, among others) and by product type, such as glued laminated timber, CLT, reclaimed timber, bamboo or hybrid systems. As an example, the website features the LIFE Lugo + Biodinámico gridshell in Lugo, a warehouse built as a glulam lattice shell.

For privacy reasons, the exact address is only published when the architects or companies have already made it public; otherwise, the neighbourhood, city or district is given.

More than 800 buildings, more than 15 classification parameters and over 235,000 visits: the map has grown fifteenfold since its launch

Who the map is for

Toca Madera identifies five user profiles: researchers, who can consult projects quickly and interactively; technical professionals from outside the sector who want to get closer to timber; people who already work with the material and look for nearby references to support the local economy; timber companies and builders, who gain visibility and a professional network; and timber enthusiasts in general.

The tool has also been put forward as a teaching resource. CAMBIUM, the Valencian regional government’s national reference centre for wood and cork, suggested in 2020 using it in the classroom, for example in professional certificates in the wood, furniture and cork (MAM) family and in vocational training courses.

As early as 2021, Jimeno pointed out some trends visible on the map: in Spain, projects were concentrated in the north, from Galicia to Catalonia via the Basque Country and Navarre, and in Madrid, with civil engineering works (bridges and footbridges) weighing more than multi-family housing; in Europe, the densest areas were Austria, southern Germany, Switzerland, northern Italy, the United Kingdom and the Nordic countries.

How to contribute

The map is collaborative: it is fed by contributions from professionals, companies and users. Since September 2023, adding a project only requires sending an email to Toca Madera with the subject line “AÑADIR MAPA COLABORATIVO”, attaching the form for each building and its photographs. Anyone wishing to appear in the credits can say so in the same email. All the information and access to the map viewer are on the blog’s collaborative map page (in Spanish).

Between 30 and 40 more projects will be added in December to a database that has kept growing since 2020

Next steps: new buildings in December

The database keeps growing. As Jimeno told Construnews, between 30 and 40 more projects will be added in December.

The map also underpins other work. Jimeno is co-author of a report on CLT projects, for which she wrote chapter 6, covering the list of projects and several success stories, based on the map’s database. She has presented the tool at various forums, including the webinar Madera industrializada a un solo clic (Industrialised timber in one click), organised by the Colegio de Aparejadores de Madrid, and at REBUILD, together with LignumTech.

Newsletter

Recent posts

«Out of the Picture» comes to DART to show how architectural history left women out

Out of the Picture (90 min) premieres in Spain at DART: Friday 27 Nov, 7 pm, Mooby Bosque. 1991 Pritzker went to Venturi alone.

«Primum Non Nocere»: CSCAE’s teaching unit brings the link between architecture and health into the classroom

20+ experts, 2 pilot workshops, a 94-hexagon board, 48 cards and 11 audiovisual pieces. Top score among 474 proposals.

Artificial intelligence redraws the hospital: fewer nurse stations, wider corridors and more technical infrastructure

AI may cut nurse stations; robots need wider corridors. US healthcare construction spending is forecast to grow 4.4% in 2027 (AIA)

DAMAC enters Al Zorah with an $817m project as AECOM takes on project management for the new Khafji coastal destination

DAMAC plans an $817m waterfront project in Ajman; AECOM to manage Khafji, a Saudi destination of 8 neighbourhoods and 16,000 homes

Batlleiroig and OHLAB among the first winners at the World Architecture Festival 2026

416 finalists, more than 130 judges and 23 categories: Batlleiroig and OHLAB win on Day One of WAF 2026 in Fort Lauderdale, Florida

France speeds up the exit from gas in buildings: how Europe and the EU are moving to retire the fossil boiler

France: no gas in new homes from 2027 and a €1,000 premium. EU: zero-emission new buildings in 2030 and end of fossil boilers in 2040

ICO approves a €1.16bn programme to finance industrialised housing from the factory floor to the development

ICO €1.16bn programme with three products: production loans up to 24 months, factory loans up to 15 years and developer loans.

Spain’s public works tenders near €31.3bn to October, up 25.4% on 2025

Works tenders to October: €31.29bn (+25.4%); October, €3.21bn; local govt, €13.31bn (+35.1%); housing, +80.3%

Related posts

Artificial intelligence redraws the hospital: fewer nurse stations, wider corridors and more technical infrastructure

AI may cut nurse stations; robots need wider corridors. US healthcare construction spending is forecast to grow 4.4% in 2027 (AIA)

DAMAC enters Al Zorah with an $817m project as AECOM takes on project management for the new Khafji coastal destination

DAMAC plans an $817m waterfront project in Ajman; AECOM to manage Khafji, a Saudi destination of 8 neighbourhoods and 16,000 homes

Engel & Völkers markets the first Destination by Hyatt on mainland Spain, a €100 million complex in Benahavís

€100M investment, 133 branded residences, 164 hotel rooms, a 22,425 m² plot and 191 jobs. Completion in 2029

Innovation is winning new contracts for construction, but only one in four organisations sees it in margins and costs

61.2% see new contracts as a benefit of innovation; only 24.5% see better margins. Investment gap: €485.7M a year

Casais buys 80% of ACR to lead industrialised construction in the Iberian Peninsula

Casais buys 80% of ACR. It posted €1,017M in revenue in 2025 and aims to lead Iberian industrialised construction by 2030

Simon Signature in Palma: a space to design hotel lighting and prove sustainability with data

Simon Signature in Palma: 100 m² on Calle Can Brondo, a hospitality focus and LOLA to track comfort, consumption and efficiency

Cosentino approves Cloen’s dual invisible induction for 12 mm Dekton worktops

Cloen's dual invisible induction under 12 mm Dekton: 3 inductors, no through-holes, valid for all Dekton colours except Halo and Dunna

Spain’s cement consumption falls 13% in October and Oficemen cuts its forecast: 2026 to close at around 16.6 million tonnes

October: 1,455,572 t of cement (-13%). January-October: 13.83 Mt (+1.1%). October exports: -22.4%. Expected year-end: 16.6 Mt

The Gulf speeds up Expo 2030 works while cancelling contracts, and North America builds 30% more than the EU

The US and Canada spent €2.09 trillion on construction in 2025, 30% more than the EU (€1.6 trillion), per Census, StatCan and FIEC