Spain’s public works tenders near €31.3bn to October, up 25.4% on 2025

The Data
Works tenders to October: €31.29bn (+25.4%); October, €3.21bn; local govt, €13.31bn (+35.1%); housing, +80.3%

Spain’s public authorities tendered works worth €31.29bn between January and October 2026, 25.4% more than in the same period of 2025, according to the Public Tender Statistics just published by SEOPAN, the Spanish association of construction companies and infrastructure concessionaires. In October alone, works contracts worth €3.21bn were announced.

An October above the monthly average

With €3,213.2m tendered in October, the month ranks among the strongest of the year, behind only July (€5,268.9m), January (€3,691.6m) and March (€3,604.1m). Local government accounted for €1,544.2m, the central government (AGE) for €1,078.2m and the regional governments for €590.8m.

By type of work, the month was almost evenly split: €1,601.9m in building and €1,611.3m in civil engineering. Within building, €560.3m went to housing; in civil engineering, €846.9m went to transport, of which €425.6m were roads and €290.5m railways. Within central government, ADIF tendered €289.7m in October, the Port Authorities €256.6m and AENA €164m.

Local government, the largest contracting body

Over the first ten months, local government totals €13,308.3m, 42.5% of the total and 35.1% more than a year earlier. The jump is largely due to other local administrations, which rise from €571.4m to €2,570.7m (+349.9%). Provincial capital city councils tendered €3,156.2m (+19.3%), the other city councils €5,993.1m (+16.5%) and provincial councils and island councils €1,588.3m (+6.8%).

Central government has tendered €9,499.7m (+27.1%), 30.4% of the total. The Ministerio de Transportes y Movilidad Sostenible and its bodies account for €6,141.1m (+34.7%), with strong growth at AENA, from €380.7m to €1,552.4m (+307.8%), the Dirección General de Carreteras, which almost doubles to €673.1m (+97.6%), and the Port Authorities, with €895.5m (+52.4%). In contrast, ADIF cuts its tenders by 18.8%, to €2,427.7m. The Ministerio para la Transición Ecológica y el Reto Demográfico totals €684.5m (+18.1%).

Local government has tendered €13.31bn to October, 42.5% of the total and 35.1% more than in 2025

Regional governments grow the least: €8,481.3m (+11%). The Comunidad de Madrid leads with €1,722.5m (+40.6%), followed by the Generalitat de Catalunya with €1,459.2m (+34.9%) and the Generalitat Valenciana with €973.4m (+55.7%). The Junta de Andalucía cuts its tenders by 44.6%, to €668.8m, and the Government of Extremadura by 46.5%.

Building grows faster than civil engineering

Building totals €14,676.5m to October, 34.5% more, and accounts for 46.9% of tenders. Housing is one of the fastest-growing items: €2,281.5m, up 80.3% on 2025. Non-residential building reaches €12,395.1m (+28.5%), driven by other facilities (€6,127.1m, +84.7%), including administrative buildings (€3,494m, +88%), industrial buildings (€858m, +89.1%) and terminals (€1,775.1m, +76.4%). Social facilities are almost flat (€6,268m, −1%): sports facilities grow (+56.2%), while educational (−21.4%) and healthcare (−9.2%) facilities fall.

Civil engineering totals €16,612.8m (+18.3%), 53.1% of the total. Transport rises 30.5% to €8,388.2m, thanks to roads (€4,118.6m, +69.9%), while railways grow 7.4% (€3,656.2m) and ports 1.9% (€613.4m). Urban development totals €5,105.4m (+14.2%) and water works €2,596.5m (+9.1%). Environment is the only major item in decline: €522.7m, down 31.8%.

Housing tenders reach €2.28bn to October, 80.3% more than in the same period of 2025

New build and refurbishment

According to the statistics, new build accounts for 56.4% of works tendered to October and refurbishment for 43.6%. The former grows 29% and the latter 20.9%. In roads, refurbishment outweighs new build (60.3% versus 39.7%), whereas new build dominates in railways (77.3%) and also in housing (75.2%).

Catalonia and Madrid lead by region

By location of the works, Catalonia tops the ranking with €6,267m (20% of the total, +67.3%), followed by the Community of Madrid with €4,481.7m (+64.5%) and Andalusia with €3,975.5m (−3.2%). The top five are completed by the Valencian Community (€2,693.6m, −0.1%) and the Canary Islands (€2,232.9m, +78.4%). The regions with the largest falls include Extremadura (−31.2%), the Basque Country (−29.7%) and Castile and León (−11.5%).

€37.44bn over the last twelve months

On a rolling-year basis, between November 2025 and October 2026 works tenders totalled €37,437.6m, 20.5% more than in the previous twelve months. Local government contributed €15,843.1m (+27.7%), central government €11,430.6m (+25.5%) and the regional governments €10,164m (+6.5%).

Services contracts, reported separately

Since 2023, SEOPAN has separated works contracts from services contracts for road conservation and operation and ADIF rail maintenance in its reports, because their periodic tendering distorts year-on-year changes. In the services report, the 2026 figure (to October) is €694.3m, from the regional governments (€410.8m) and local government (€283.6m), compared with €1,972m for the whole of 2025.

Public investment in infrastructure has been debated in the sector in recent months, as Construnews reported in its interview with SEOPAN president Julián Núñez (in Spanish) and in the public works sector’s calls for reform (in Spanish) over rising costs and low execution.

Newsletter

Recent posts

«Out of the Picture» comes to DART to show how architectural history left women out

Out of the Picture (90 min) premieres in Spain at DART: Friday 27 Nov, 7 pm, Mooby Bosque. 1991 Pritzker went to Venturi alone.

«Primum Non Nocere»: CSCAE’s teaching unit brings the link between architecture and health into the classroom

20+ experts, 2 pilot workshops, a 94-hexagon board, 48 cards and 11 audiovisual pieces. Top score among 474 proposals.

Artificial intelligence redraws the hospital: fewer nurse stations, wider corridors and more technical infrastructure

AI may cut nurse stations; robots need wider corridors. US healthcare construction spending is forecast to grow 4.4% in 2027 (AIA)

DAMAC enters Al Zorah with an $817m project as AECOM takes on project management for the new Khafji coastal destination

DAMAC plans an $817m waterfront project in Ajman; AECOM to manage Khafji, a Saudi destination of 8 neighbourhoods and 16,000 homes

Batlleiroig and OHLAB among the first winners at the World Architecture Festival 2026

416 finalists, more than 130 judges and 23 categories: Batlleiroig and OHLAB win on Day One of WAF 2026 in Fort Lauderdale, Florida

France speeds up the exit from gas in buildings: how Europe and the EU are moving to retire the fossil boiler

France: no gas in new homes from 2027 and a €1,000 premium. EU: zero-emission new buildings in 2030 and end of fossil boilers in 2040

ICO approves a €1.16bn programme to finance industrialised housing from the factory floor to the development

ICO €1.16bn programme with three products: production loans up to 24 months, factory loans up to 15 years and developer loans.

A collaborative map now brings together more than 800 timber buildings

Toca Madera's collaborative map brings together over 800 timber buildings, classified under 15+ parameters, with over 235,000 visits.

Related posts

ICO approves a €1.16bn programme to finance industrialised housing from the factory floor to the development

ICO €1.16bn programme with three products: production loans up to 24 months, factory loans up to 15 years and developer loans.

Casais buys 80% of ACR to lead industrialised construction in the Iberian Peninsula

Casais buys 80% of ACR. It posted €1,017M in revenue in 2025 and aims to lead Iberian industrialised construction by 2030

Radar España now sends Telegram alerts when a train, bus, metro or tram is cancelled or delayed

Radar España tracks trains, metros, trams and buses with open data from Renfe, the NAP and dozens of operators, with Telegram alerts

Spain’s cement consumption falls 13% in October and Oficemen cuts its forecast: 2026 to close at around 16.6 million tonnes

October: 1,455,572 t of cement (-13%). January-October: 13.83 Mt (+1.1%). October exports: -22.4%. Expected year-end: 16.6 Mt

The Gulf speeds up Expo 2030 works while cancelling contracts, and North America builds 30% more than the EU

The US and Canada spent €2.09 trillion on construction in 2025, 30% more than the EU (€1.6 trillion), per Census, StatCan and FIEC

Zaha Hadid Architects designs what will be Africa’s largest airport, in Ethiopia: 60 million passengers by 2030 and 110 million at full build-out

Phase 1: US$12.5bn, 660,000 m² terminal, 2 runways and 60M passengers by 2030; at full build-out, 110M, 4 runways and 270 aircraft

Sika warns that saving €10,000 when building a stadium can cost €1.25 million over its service life

Law of fives: €1 saved on construction = ×5 in maintenance, ×25 in minor repairs and ×125 in major repairs.

The software platforms that dominate the AECO sector: Autodesk’s AECO segment brings in $3,583 million

Software for architecture, engineering, construction and operations (AECO) is enjoying a period of sustained...

Digital infrastructure sets the pace for global construction in 2027 as Europe grows at half speed

Consultancy Deloitte has published its 2027 Engineering and Construction Industry Outlook, focused on the...