Sika packs its stadium offer into eight pages: roofs, concrete, floors and joints built to withstand daily use

The international brochure “Your trusted partner for stadiums and arenas” covers the building from basement to roof, identifies three design challenges and breaks sustainability down by life-cycle stage, with product examples and digital tools

The Data
4 systems, 3 design challenges and a sustainability analysis across 5 stages and 6 aspects: Sika's stadium brochure

With the 2030 World Cup stadiums in the midst of works and tenders, Sika, sponsor of the stadium data monograph that Construnews is preparing, has put forward its international brochure for stadiums and arenas. Published by Sika Services AG in November 2025, the document sets out in eight pages how the company approaches the construction and maintenance of these venues, “from basement to roof”.

An iconic building that must work every day

The brochure starts from one premise: a stadium has to combine unique aesthetics with functionality and sustainability, and every detail matters, from structural safety to user experience and accessibility. To this end, Sika groups into a single offer high-performance roofing, structural strengthening and bonding, grouting, seamless flooring, joint sealing, concrete admixtures and waterproofing for facades, basements and substructures.

The company stresses the role of project management and advanced planning: a team of specialists helps project teams identify the best-fit solutions for each case. According to the document, owners, design consultants, contractors and applicators have relied on Sika for the construction of numerous stadiums worldwide.

A stadium has to combine unique aesthetics with functionality and sustainability, and every detail matters

Three challenges before design

The document identifies three challenges. The first is visual identity: stadiums are landmarks, and owners and architects often ask for customised colours, textures and integrated logos that reflect the character of the club or venue. That aesthetic ambition must coexist with durability against weathering, UV exposure and foot traffic.

The second is the pressure to reach net zero: lower energy use, longer service life and low-emission, low-maintenance materials. Sika presents its systems as a way to reduce life-cycle costs and provide the documentation required by certifications such as LEED or BREEAM.

The third is structural. Long spans, crowd vibration, temperature changes and wind loads subject the structure to significant stress and movement, especially in refurbishment and redevelopment. The brochure’s answer lies in solutions to improve concrete strength and joint systems able to absorb extreme movement, ensure watertightness and meet seismic and passive fire protection requirements.

Four systems, from top to bottom

For roofing, Sika offers its Sarnafil®, Sikaplan®, Sikalastic® and SikaShield® systems, with FPO, PVC and bitumen membranes and liquid-applied solutions, which must be watertight and durable while matching the shape and colour envisaged by the architect.

For concrete, precast or in situ, the company provides admixtures to improve quality, durability and speed of production, with the aim of reducing delays and defects on fast-track projects. The SikaFiber® software helps calculate fibre dosage and slab design.

For flooring, the brochure lists the spaces under most strain: concourses, kitchens, restaurants, lounges, plant rooms and car parks. For them it proposes low-VOC, low-odour, low-maintenance, fast-curing and easy-to-apply floors.

For basement and slab-on-grade waterproofing, from underground car parks to podium terraces and stands, it combines SikaProof® membranes and Sikalastic® liquid-applied systems with Sika® Waterbar FB-125, SikaFuko® injection hoses, Emseal®/Wabo® joint systems and Sikaflex® sealants.

Long spans, crowd vibration and temperature changes subject the structure to stresses that are compounded in refurbishments

Sustainability by stage

One of the most detailed parts of the document is a diagram that analyses sustainability across five life-cycle stages (product, concrete production, construction, use and end of life) and six aspects: CO₂ emissions, health and safety, energy, durability, waste management and resource and material consumption.

At the product stage, it cites the recycled content of Sarnafil® membranes and SikaGrout®-800 and SikaGrout®-340+ grouts, as well as recycled content in the packaging of the SikaProof® A+ membrane. In concrete production, Sika® ViscoCrete® admixtures reduce water and cement and allow higher cement replacement and recycled aggregates. On site, SikaRapid® helps reduce clinker content and Sika® Retarder® avoids waste from surplus concrete.

At the use stage, the brochure highlights the durability of the SikaProof® A+ system, Sika floor systems, Sika AnchorFix® and Sarnafil® TG 76 Felt PS, and the low VOC emissions of flooring and sealants. At end of life, the Sarnafil® AT membrane holds Cradle to Cradle silver certification, and superplasticisers support the use of recycled aggregates. The document itself notes that these are examples and refers to case studies for specific figures.

The brochure analyses sustainability across five life-cycle stages and six aspects, from CO₂ to waste management

Data for the BIM model

The final section is devoted to digitalisation. Under the SikaVision® brand, Sika groups tools to monitor, collaborate, optimise and predict key aspects of construction and refurbishment projects, and provides reliable data for project teams’ BIM models. The brochure sums up three benefits: more efficient processes, data-based decisions and better product performance.

The document closes with the idea of a global company with a local presence and refers to Sika’s Global Project Support service for projects. It can be read in full below.

Newsletter

Recent posts

From basement to roof: how Sika is tackling the wave of stadium works ahead of the 2030 World Cup

16 major stadium projects in Spain since 2016 total around €3.66bn; the Bernabéu (1,407.7m) and Camp Nou (960m) account for 65%

Sonia Cobos: “It would be a mistake to focus all our attention on the big World Cup stadiums”

18 stadiums in contention and over 1.1 million seats for the 2030 World Cup; Sika has worked on the Bernabéu, Camp Nou and RCDE Stadium

Hong Kong closes CIExpo 2026 with 33,000 visits and puts industrialisation at the heart of its construction strategy

CIExpo 2026 drew 33,000 visits to Hong Kong, with over 190 exhibitors from 12 countries and regions and five conferences in three days

Carlo Ratti to direct the 2027 Seoul Biennale of Architecture and Urbanism, with an architecture curator who will not be human

Carlo Ratti will direct the 6th Seoul Biennale (2027), launched in 2017. Theme and programme: 8 Dec. Its architecture curator isn't human.

European Parliament calls for a 300-day cap on environmental assessments and a 90-day track for housing

Environmental assessment: max. 300 days (+60 exceptional). Housing: 30 days to decide, 90 to assess. Plenary: 367 for, 268 against

Only one in five construction professionals has built AI into their workflows

19% have built AI into automated workflows or agents, 54% only use it for queries and 27% do not use it yet

Spain’s notaries estimate the housing shortage will reach 1.4 million homes by 2030

Shortage of 750,000 homes in 2021-2025 and 1.385 million by 2030; 683,000 sales in 2026 (-9%) and flat prices up 15.6%

Borrell at the 12th Global Engineering Forum: “Europe is not a geopolitical power”

Defence at 5% of GDP (1.5% infrastructure), €413bn of investment over 10 years and 300-400 MW of data centre capacity in Spain

Related posts

From basement to roof: how Sika is tackling the wave of stadium works ahead of the 2030 World Cup

16 major stadium projects in Spain since 2016 total around €3.66bn; the Bernabéu (1,407.7m) and Camp Nou (960m) account for 65%

Sonia Cobos: “It would be a mistake to focus all our attention on the big World Cup stadiums”

18 stadiums in contention and over 1.1 million seats for the 2030 World Cup; Sika has worked on the Bernabéu, Camp Nou and RCDE Stadium

Hong Kong closes CIExpo 2026 with 33,000 visits and puts industrialisation at the heart of its construction strategy

CIExpo 2026 drew 33,000 visits to Hong Kong, with over 190 exhibitors from 12 countries and regions and five conferences in three days

Only one in five construction professionals has built AI into their workflows

19% have built AI into automated workflows or agents, 54% only use it for queries and 27% do not use it yet

Artificial intelligence redraws the hospital: fewer nurse stations, wider corridors and more technical infrastructure

AI may cut nurse stations; robots need wider corridors. US healthcare construction spending is forecast to grow 4.4% in 2027 (AIA)

DAMAC enters Al Zorah with an $817m project as AECOM takes on project management for the new Khafji coastal destination

DAMAC plans an $817m waterfront project in Ajman; AECOM to manage Khafji, a Saudi destination of 8 neighbourhoods and 16,000 homes

A collaborative map now brings together more than 800 timber buildings

Toca Madera's collaborative map brings together over 800 timber buildings, classified under 15+ parameters, with over 235,000 visits.

Engel & Völkers markets the first Destination by Hyatt on mainland Spain, a €100 million complex in Benahavís

€100M investment, 133 branded residences, 164 hotel rooms, a 22,425 m² plot and 191 jobs. Completion in 2029

Innovation is winning new contracts for construction, but only one in four organisations sees it in margins and costs

61.2% see new contracts as a benefit of innovation; only 24.5% see better margins. Investment gap: €485.7M a year